Installing the Vertical Frame
Consult our online assembly video at merrithew.com/eq-assembly
1. Remove the receptacle covers and slide vertical frame into
receptacles. For Max Plus models, position pulley system facing
carriage. For traditional models, position highest eyehooks
facing carriage. Tighten all four hex bolts. Attach springs, roll-down
bar and safety chain as illustrated. See page 7 [fig. Traditional
vertical frame].
We strongly advise that two people perform this step to
CAUTION:
ensure the frame bars are level and fit evenly and securely into the
receptacle to allow for proper alignment.
3. To alter the height of traveling pulleys, pull out spring-loaded
stoppers. Shift the traveling pulleys up or down vertical sliding
tracks and release spring-loaded stoppers. Shake pulleys to confirm
they are fully locked into stopper positions.
Removing the Vertical Frame
Remove all springs from vertical frame, including roll-down bar
and safety chain. Loosen all four hex bolts at the base of
receptacles. Secure push-thru bar in place by hand while
removing vertical frame.
NOTE:
Requires two people.
REFORMER INFORMATION FOR USE
2.
To use traveling pulleys extend ropes and
MAX PLUS FRAMES:
detach double-ended swivel spring clips and Soft Reformer Loops.
Pinch end loop of ropes and insert through the bottom of traveling
pulleys. Reattach double-ended spring clips and Soft Reformer
Loops and reset rope to desired length.
4. For exercises using arm or leg springs, attach
springs to traveling spring hooks, and adjust height
in the same way as traveling pulleys. After changing
position, shake spring hooks to confirm they are fully
locked into stopper positions.
9