Chapter 6.
This chapter presents the following information:
The manufacturer's responsibility

Periodic Functional Testing and Maintenance

Returning the generator for service
Software Upgrades
Caution
Read all warnings, cautions, and instructions provided with this generator before use. Specific instructions for
CoolSeal
instruments are not included in this manual. Refer to the CoolSeal
warnings, cautions, and instructions for its use.

Responsibility of the Manufacturer

Bolder Surgical is responsible for the safety, reliability, and performance of the CoolSeal
conditions have been met:
Installation and setup procedures in this manual are followed.
Persons authorized by Bolder Surgical carry out assembly, operation, re-adjustments, modifications, or repairs.
The electrical installation of the relevant room complies with local codes and regulatory requirements, such as IEC and BSI.
The equipment is used in accordance with the Bolder Surgical instructions for use. For warranty information, refer to the
Warranty section in this manual.
Periodic Functional Testing and Maintenance

When should Periodic Functional Testing be performed?

Bolder Surgical recommends that a Periodic Functional Test of the CoolSeal
two years. The Periodic Functional Test should only be performed by a qualified biomedical technician or the CoolSeal
Generator may be returned to Bolder Surgical or its distributor for Periodic Functional Testing. See Appendix A for detailed
instructions on the Periodic Functional Test.

When must the power cord be replaced?

Replace the power cord if you find exposed wires, cracks, frayed edges, or a damaged connector.

When should the fuses be replaced?

The hospital biomedical engineering department may occasionally need to replace fuses. Fuses should be replaced either
when a fuse has sacrificially protected the CoolSeal
preventative maintenance. If repeated fuse failures occur in a short period do not continue replacing fuses and return the
CoolSeal
Generator for service.

How can the fuses be replaced?

1.
Turn off the generator and disconnect the power cord from the wall outlet.
2.
Disconnect the system power cord from the electrical inlet on the rear panel.
3.
Unlatch the fuse tray from below the electrical inlet.
4.
Remove both fuses.
5.
Obtain fuses rated as labelled below the electrical inlet on the rear panel.
6.
Insert both fuses.
7.
Insert and latch fuse tray.
Bolder Surgical
Periodic Functional Testing, Maintenance and Service
Generator be performed at least once every
Generator or as specified by hospital biomedical engineering for
Page | 21
instrument's instructions for use for
Generator only if all the following
en - CoolSeal™ Generator
Tabla de contenido
loading

Este manual también es adecuado para:

Csl-200-50

Tabla de contenido