OEM VOLTAIRE Manual De Uso Y Mantenimiento página 71

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

VOLTAIRE
Installation and connections
b. Lower nozzles (Fig.13):
• Remove the knobs (6).
• Loosen the screws (7) and remove the panel (8).
• Loosen the screws (9) and remove the panel (10).
• Unscrew the nozzle (11) of the burner gas supply ramp
and replace them with appropriate ones, taking care to
properly insert the sealing washer made of aluminum.
• Unscrew the pilot flame nozzle (12), the nozzle (13)
of the burner ignition and replace them with the ones
adjusted.
At the end of the replacement perform a leakage test
for gas as described in the respective section.
• Reassemble everything proceeding in reverse order.
WARNING
The trasformation done, affix the correct label gas
for predisposition handed in with the kit nozzles.
FIG. 13
9
10
7
7
8
6
GB - 23
Tabla de contenido
loading

Tabla de contenido