Pontos AquaCycle 2500 Instrucciones De Montaje página 161

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Test of the electrical components
22. Test all consumers in turn in Manual
mode (see chapter 6.7.1) to make sure
that they work.
Filling with carrier material
23. Empty the tank B1 by 50% via the
manual ball valve.
24. Empty the tank B2 by 50% via the
electric ball valve VA1.2.
25. While emptying the tanks, inspect the
collecting pipe to the sewer for leaks.
26. Empty the contents of 5 bags of carrier
material into tank B1, and the same
amount into tank B2. The carrier
material is the foam cubes packed in
bags.
Note!
Do not put carrier material into the
tank B3
Dispose of the empty plastic bags.
Checking the system state
27. Return to the Main Menu and compare
the system state displayed on the
controller (see chapter 6.8) with the
actual system state.
"Run-in period" switchover
28. Restart the system's "run-in period".
(see chapter 6.3.2)
Version 2.5
Operating Manual AquaCycle 2500
EN 17
Tabla de contenido
loading

Tabla de contenido