5.5
Installing the IP gateway
The wireless IP gateway allows you to remotely access and control the system over the Internet using the online software at
https://GlobalGuard.Friedland.co.uk or using the Apple/Android GlobalGuard apps. To remotely access the system, the Internet
connection the IP gateway is connected to must be active. The Internet connection must be free from any firewalls or other
restrictions that can prevent remote access.
5.6
Linking the IP gateway to the control panel (optional)
The supplied IP gateway has been pre-linked to the control panel at the factory.
To link an IP gateway to the control panel:
1.
Press the
button.
2.
Enter the 4-digit PIN code (User).
3.
Press the
button.
4.
Select the program mode "5. COMMS". The display shows "5-1 COMMS SETUP".
5.
Press the
button. The display shows "Input (01-12) Device NO.".
6.
Enter the device number (0-12). Make sure that no other device is already linked to the channel.
7.
Press the
button.
8.
Select the program mode ":2 LEARNING ID". The display shows "WAIT LEARNING...".
9.
Within 30 seconds, press and hold the link button on the IP gateway until the display shows "Learning OK".
If the control panel is powered up and left for 15 minutes, the
control panel will emit beeps and the event log indicator will
flash to indicate that control panel is searching for the IP
gateway.
To cancel the beeps and switch off the event log indicator:
a)
Press the
button.
b)
Press the
button.
To remove the control panel from the wall:
Use a flathead screwdriver to push the clip towards the wall
and push up the control panel away from the mounting
bracket.
1.
Connect the IP gateway to a LAN port on your router.
2.
Connect the black power adaptor (5V) to the power
adaptor connection.
3.
Switch on the IP gateway. The power indicator on the IP
gateway becomes green within 1 minute.
11