Diamond C4GFEV7-BF Manual De Uso E Instalación página 42

Cocina - placa radiante a gas
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
good "Equipotential" earthing system in
the area where the different appliances
will be installed.
For what concerns the connec-
tion of the appliance to the room
Equipotential system, use an
electrical yellow/green cable, suitable
to the power of the devices installed.
The appliance plate "Equipotential" is
usually on its panel, near the system
used for the connection; carry out
the connection after having recogni-
zed the same plate (see schematic
GENERAL WARNINGS
Operators have a duty to familiari-
se themselves adequately, using
this manual before performing
any intervention, adopting the specific
safety requirements to make every kind
of human-computer interaction safe.
Any technical modification that af-
fects the operation or safety of the
machine must only be carried out
by the technical personnel of the manu-
facturer or by technicians that are for-
mally authorised by the manufacturer.
Failure to do so exempts the manu-
facturer from any liability for for any pos-
sible resulting modifications or damage.
Even after appropriate familiari-
sation, upon the first use of the
appliance, in any case simulate a
number of test operations to save more
rapidly the main functions of the ap-
pliance, e.g. start-up, shut-down, etc.
The appliance is provided alrea-
dy tested by the manufacturer
and fitted with the type of gas and
electrical supply specified on the rating
plate applies.
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
drawing for the correct location).
Connect an edge of the earth electric
cable (the cable must be characteri-
zed by the double colour yellow/gre-
en) to the system used for the applian-
ce "Equipotential" connection (see
schematic drawing Fig. 1).
Connect the opposite edge of the
earth electrical cable to the system
used for the "Equipotential" con-
nection of the area where the ap-
pliance will be installed (Fig. 2).
OPERATIONS FOR COMMISSIONING
mbar,a pressure stabilizer 50 mbar
must be installed upstream of the
appliance.
FIRST COMMISSIONING
UP / Upon completion of the opera-
tions of positioning and connection to
the power sources, perform a series of
operations such as:
1. Cleaning away of the protective ma-
terials (oils, grease, silicones, etc.) insi-
de and outside of the cooking chamber
(see section 3 / Removal of protective
materials).
2. General checks and controls such as:
Check opening of switches & network
gate valves (water, electricity, gas
when applicable); Checking of drains;
Checking and monitoring of the exter-
nal fumes/vapour extraction; Checking
and monitoring of the protection panels
(all the panels must be fitted correctly).
CONTROL AND REGULATION OF
THE GROUPS GAS SUPPLY /
- 13 -
In case of supply with LPG
gas (Butane or Propane) at 50
With the connection opera-
tions described in the pre-
4.
EN
5.
START
loading

Este manual también es adecuado para:

Dimfb77fevxs