Pfeifer 181520 Traducción Del Manual Original página 87

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
6.19 The spreader beams must be inspected by an
expert at intervals of one year at the most. In case of
high demand, an expert must assess the inspections
at shorter intervals. Inspection or maintenance of the
spreader beam is to be executed by an expert at your
premises or in our production plant.
Only the due use of original spare parts will guarantee
the functionality of the spreader beams. If there are
questions on the wear of attachment devices, please
contact an expert.
6.20 The spreader beams are designed according
to EN 13 155 "Cranes – Safety – Loose Load Lifting
Devices". This regulation is fully applied when a
maximum of 20,000 load cycles are assumed.
PFEIFER spreader bars 01/2016 V 2.0 / Subject to technical changes!
7
Tabla de contenido
loading

Este manual también es adecuado para:

181523181524181526181528181531181538

Tabla de contenido