Platform Loading Procedures; Ramp Loading Procedures - Nogueira VMN 4.0 Manual De Instrucciones

Ocultar thumbs Ver también para VMN 4.0:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Platform Loading Procedures

Place the wagon, coupled to a forklift or tractor, on the loading platform, moving the platform until it is
aligned to the platform in the middle of the transport means (fig.1).
Push the wagon slowly inside of the transport means (black arrow fig.1) as immobilize it as described in
the previous chapter.
REMOVING IT FROM THE TRUCK: Lift it onto the loading platform, using a forklift or tractor, parallel to
the transport means, remove the 4 ropes which were immobilizing the wagon and the shims under the
tires, couple the wagon to the forklift or tractor and tow it on the platform (gray arrow fig.1).

Ramp Loading Procedures

Place the wagon, coupled to a forklift or tractor, aligned to the ramps (item.A), push the wagon slowly
inside of the transport means (black arrow fig.1) and immobilize it, as described in the previous
chapter.
CAUTION:
Do not load the wagon if the ramps are wet or covered ice. The loading operation
using the ramp must be performed by at least two people: the controller and the
helper, who warns about any eventual adjustments that may be necessary (the helper
must stay away from the danger zone).
REMOVING IT FROM THE TRUCK: Lift it onto the ramps, using a forklift or tractor, remove the 4 ropes
which were immobilizing the wagon and the shims under the tires, couple the wagon to the forklift or
tractor and tow it slowly (gray arrow fig.1).
16
Instruction Manual

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Vmn 6.0Vmn 8.0

Tabla de contenido