12 Maintenance
12 Maintenance
PLEASE NOTE
The maintenance work described below can be performed by the user as part of in-house maintenance.
All maintenance activities beyond this must only be carried out by an
Servicing intervals
Interval
Daily
Daily
Weekly
After 2 months
Annually
Annually or following 1000
cycles
After 24 months or 4000
cycles
As required
See also:
▪
Cleaning
[} page 53]
Checking and oiling the door lock
NOTICE
Wear of the door lock
Only use MELAG oil.
Check and oil the door lock every two months as follows:
1.
Clean the locking spindle and nut with a non-fuzzing cloth.
2.
Insert the test gauge into the door lock nut as far as it will go and turn
it 180°. If this is not possible or resistance can be felt, the door lock nut
is worn. Have the door lock nut replaced by an authorised technician.
3.
Put two drops of oil in the door lock nut.
Ê
The oil will be distributed automatically by closing the door.
52
Measure
Check for soiling, deposits or damage Chamber inc. door seal and chamber sealing
Check the operating media -
electricity, water, wastewater
Check the documentation media -
printer, network, USB
Vacuum test (in the morning before
starting work when the device is cold
and dry)
Checking and oiling the door lock
Clean the sieve
Replace the dust filter
Maintenance
Cleaning the surfaces
authorized
technician.
}
Device components
face, door lock, mount for the load
Operating media
Documentation media
Vacuum system
Door mechanism
Feed water tank
behind the service hatch
by the authorised customer services working in
accordance with the maintenance instructions
Housing parts