Replacing The Suction/Pressure Valve And Dosing Cartridge - Ecolab EcoAdd Instrucciones De Servicio

Ocultar thumbs Ver también para EcoAdd:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 838
Maintenance
12.3

Replacing the suction/pressure valve and dosing cartridge

Personnel:
Protective equipment:
1
2
3
A
4
5
6
7
Fig. 92: Replacing the suction/pressure valve and dosing cartridge
1
O-ring, hose connection, pressure side
2
Pressure valve
3
O-ring: Pump head pressure valve
4
V3 dosing cartridge
1.
Remove suction and pressure valve using an open spanner.
2.
Mount all O-rings.
3.
Fit dosing cartridges (for pump head with 5 l/h) (valve model V3)
4.
Screw in the new suction and pressure valves in the correct position.
MAN046939 Rev. 6-10.2021
n
Mechanic
n
Service personnel
n
Specialist
n
Chemical-resistant protective gloves
n
Protective eyewear
1
2
3
A
5
6
7
NOTICE!
Ensure that the metering valves are installed correctly!
Ä 'Install the metering valves in the correct position' on page 167
Tightening torques of the suction and pressure valves:
Ä Further information on page 189 .
See
1
2
3
A
5
6
7
5
O-ring: Pump head suction valve
6
Suction valve
7
O-ring, hose connection, suction-side
A
Tightening torques for dosing head screws
166
1
2
3
A
5
6
7
Tabla de contenido
loading

Tabla de contenido