Control/software
8.9
Select
Pump [calibration] should be performed again after initial installation to take into
account the local operating and ambient conditions. This corrects any deviations in the
performance data (e.g. due to cable cross-sections, back-pressure, temperature). The
[Calibration] takes around two minutes.
When performing the [Calibration], you must refer to
start-up' on page 141 .
Video link
A video showing the calibration of the EcoAdd is available at the following
link.
https://www.youtube.com/watch?v=wHc4qMD5KMA
Fig. 69: [Calibration]
MAN046939 Rev. 6-10.2021
6
6
11
11
Ä Chapter 9.4 'Calibration on initial
4
7
12
124
5
10
8
9
15
14
13