Operation; Initial Operation - ACO Lipujet-P-OAP Instrucciones De Empleo

Separador de grasa
Ocultar thumbs Ver también para Lipujet-P-OAP:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 132
Grease Separator

Operation

4 Operation

4.1 Initial Operation

A general inspection carried out by a competent person is mandatory for initial operation,
section 1.5 „Qualification of Persons".
Cut off the rubber protruding from the
Î
lid (cover plate) for ventilating the oil
container.
Check the oil level of the HD pump used
Î
for cleaning the interior; top up oil (type
SAR90) if necessary.
Clean the grease separator.
Î
Adjust the grease separator controls,
Î
Fill up the grease separator with fresh water up to the at-rest water level (drain
Î
connection pipe bottom):
All types: through the intake pipe or an inspection door.
Alternatively for types -M, -MP (optional for types: -B, -D): through the ball valve of the
fresh water filling unit.
Alternatively for types -A, -AP: Switch on the
"Controls and displays (box
The water level will rise automatically up to the lower level in the vessel.
Close inspection doors.
Î
Open the slide in the intake and outlet pipes.
Î
Check the grease separator and all the pipe connections for impermeability.
Î
For models with a disposal and cleaning system: carry out a test run,
Î
„Extension stage 3 (with a disposal pump)".
52
section 4.2.2 „Menu settings"
fresh water inflow,
).
section 4.2.1
section 4.4.7
Tabla de contenido
loading

Este manual también es adecuado para:

Lipujet-p-rapLipujet-s-oapLipujet-s-rap

Tabla de contenido