Connecting A Pendulum Gas Line - ACO Lipujet-P-OAP Instrucciones De Empleo

Separador de grasa
Ocultar thumbs Ver también para Lipujet-P-OAP:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 132
Grease Separator
Installation
Install a gradually rising disposal pipe from the grease separator to the discharge point
(waste disposal vehicle), make changes in the pipe direction with 90° elbow joints with
the greatest possible ratio.
Lay the disposal pipe with as consistent a diameter as possible up to the discharge point
(waste disposal vehicle). Suction pipes of at least DN 65.
Drinking water connection pipe requirements:
NOTICE Observe regional regulations for connecting the filling unit to the drinking water
network.
A permanent water connection pipe for filling the grease separator must have a free
drain in compliance with legal requirements. ACO grease separators with a filling unit
meet these requirements. An R 3/4 drinking water connection is required for the filling
unit. The built-in pressure reducer is set at 4 bar.
Install a stop valve in the water connection pipe if possible.

3.1.3 Connecting a Pendulum Gas Line

In order to avoid unpleasant smells during disposal, the outgoing air from the waste disposal
vehicle should be led out through the roof with a pendulum gas line.
If it is not possible to connect a pendulum gas line to the ventilation pipe (7), a connection
may be installed direct on the grease separator.
Pendulum gas line
50
Disposal pipe
Tabla de contenido
loading

Este manual también es adecuado para:

Lipujet-p-rapLipujet-s-oapLipujet-s-rap

Tabla de contenido