Setup
Date and Time Setup
The machine is programmed at the factory for the local
time zone, using a 24-hr. clock, and date. Note: The
date changes only by scrolling through an entire day.
1. Use the LEFT and RIGHT arrow keys to modify the
minutes displayed.
2. Use the UP and DOWN arrow keys to modify the
hour displayed.
3. Press OK to accept the date and time.
Service Installation Cleaning
At this point the machine clears its internal plumbing
before proceeding with setup.
1. When prompted, connect the service hoses from the
machine to their storage ports as shown in Figure 3.
2. Open the service couplers.
The machine performs an internal clearing of its
plumbing, and then sounds an alarm when the Tank
Fill Adjustment screen is displayed.
3. Check the vacuum pump oil level sight glass and
verify the oil level is correct.
Tank Fill Adjustment
The operator may either accept the machine's pre-
set default weight of 6.1 kg (13.4 lbs.) of refrigerant
stored in the ISV, or change to a lesser amount to
accommodate the application. The maximum amount
allowed for new refrigerant is 6.1 kg, which leaves room
for additional recovery.
1. The machine displays
Press OK to accept the default amount, or use the
keypad to enter an amount and press OK.
12
6.1 KG
Figure 3
Service Hoses
Connected to
Storage Ports