Starting Initial Installation
Problem
The vehicle is not charged with
the available excess solar elec-
tricity
66
Possible cause
EEBus connection was unsuccessful or con-
nection was briefly interrupted
EEBus device has the wrong phase assign-
ment
A fuse that does not protect the energy man-
ager has tripped
Current converters are connected incorrectly
Current converter not or incorrectly config-
ured
EEBus connection was unsuccessful or con-
nection was briefly interrupted
EEBus device has the wrong phase assign-
ment
Photovoltaic system incorrectly configured
Remedy
e
Repeat EEBus connection on the EEBus device and, if necessary, boost the
communication signal (WiFi or PLC).
g Pay attention to the manual of the EEBus device.
e
In the Web Application HOME INSTALLATION, check whether (the correct)
current converters have been assigned to the current consumer.
e
You can purchase current converters for protecting further fuses for cables
leading to the EEBus device from your Porsche partner.
e
Have these fitted and configured by a qualified electrician.
e
The qualified electrician checks whether the direction arrow of the current
converter is pointing towards consumption, and whether the cables are
correctly connected to J200, J300 and J301 connectors.
e
Check whether the connection positions of the current converters on the
energy manager match the configuration in the Web Application HOME
INSTALLATION (CT#). In addition, check that the configured phases of the
current converters match the voltage measurement phases.
e
Repeat EEBus connection on the EEBus device and, if necessary, boost the
communication signal (WiFi or PLC).
g Pay attention to the manual of the EEBus device.
e
In the Web Application HOME INSTALLATION, check whether (the correct)
current converters have been assigned to the EEBus device or whether
there is a phase rotation when connecting the EEBus device. The qualified
electrician modifies the configuration or the wiring.
e
The qualified electrician checks whether the photovoltaic system is con-
nected on the grid side or on the load side and checks the corresponding
configuration in the Web Application HOME INSTALLATION, as well as the
assignment of the phases and current converters.