Unpacking and Inspection
7
Unpacking and Inspection
➤ Check all items against the packing list to ensure all cartons have
been received.
➤ Move units in the normal "up" orientation as indicated by the arrows
on each carton.
➤ Examine cartons for shipping damage, removing the units from the
cartons if necessary.
➤ If the unit is damaged, the carrier should make the proper notation on
the delivery receipt acknowledging the damage.
8
Installation
!
CAUTION! Danger of injury
The system may only be installed by qualified personnel from a special-
ist company. The following information is intended for technicians who
are familiar with the guidelines and safety precautions to be applied.
Plan all connections which must be made including
– ducting,
– condensate drain,
– seawater in and out,
– electrical power connections,
– location of control,
– seawater pump placement,
to assure easy access for routing and servicing.
I
NOTE
Review the following guidelines prior to and after installation.
16
MCS5, MCS10, MCS15
EN