Machine Positioning - Bosch TCE 4420 Manual Original

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
4.2.7

Machine positioning

1. Put back in place the side door.
2. Loosen the two screws that fix TCE 4420 to the
pallet.
Warning - damage risk!
The lifting belts can crush the flexible supply
pipes of the cylinder or damage the applied
parts of the TCE 4420.
Insert the lifting belts carefully.
3. Remove the horizontal sliding arm plastic protec-
tions and the rear protection of the locking lever.
Robert Bosch GmbH
Initial commissioning | TCE 4420 | 29
4. Insert the appropriate lifting belts (length belt 1: 1
Mt, belt 2: 3 Mt), with sufficient capacity, as shown.
2
!
Warning - tilting danger!
The barycentre of the TCE 4420 does not lie
in its centre.
It is necessary to lift the machine slowly.
5. Lift the TCE 4420 with a lift crane and install it in the
designed area respecting the minimum distances as
shown in the picture.
en
1
|
1 695 105 426
2010-02-16
Tabla de contenido
loading

Tabla de contenido