3. Insert the bead breaking arm and centre the joint pin
with the cylinder rod, ensuring that the flat part of
the joint pin is facing the outside.
4. Insert the hinge-pin and put back in place the exter-
nal elastic ring.
5. Position the return spring on the appropriate tab.
6. Remount the adjusting bush.
4.2.6
Mounting of the inflation device
1. Connect the gauge support to the column with the 2
provided screws.
1
2
Robert Bosch GmbH
Initial commissioning | TCE 4460 | 31
2. Connect the air tubes to the rapid joints of the ma-
nometer, by inserting them in the appropriate holes:
the pipe coming from the front joint of the inflation
pedal (1) in the internal joint (nearer to the column),
the pipe coming from the rear joint of the inflation
pedal (2) in the external joint.
2
1
4.2.7
Machine positioning
1. Put back in place the side door.
2. Loosen the two screws that fix TCE 4460 to the
pallet.
en
|
1 695 105 428
2010-02-16