DENTSPLY DeguDent Cercon heat plus P8 Instrucciones De Uso página 34

Idiomas disponibles
  • ES

Idiomas disponibles

4 Setting up the furnace
34
4.1 Moving and unpacking
The carton containing the unit and
the unit itself are very heavy (75 kg).
Use appropriate lifting aids.
Do not hold the unit by the lifting ta-
ble when unpacking to avoid damage
to the guide rails and spindle drive.
Observe the Moving and unpacking
safety notes.
1.
Move the package unit near the place where it will be
deployed.
2.
Open the cardboard case and remove the packaging
material.
3.
Remove the accessories and stored in a safe place.
4.
With two people, seize the unit from underneath (do
not lift by the lifting table) and carefully lifted out of the
cardboard case (see illustration).
5.
Use suitable carrying straps for further carrying if
necessary (see illustration).
6.
Check whether the scope of delivery is complete
(see Scope of delivery) or damage in transit. Notify
DeguDent GmbH immediately of any damage.
Note: Retain the packaging for later shipping or storing
of the unit.
loading