4-5
Control Assy
1.
Secure the control Assy to the Joint Box with 4off flange socket screws (M8x16).
Control Assy (Rear)
Joint Assy
2.
Withdraw the harnesses from the Monitor Cabinet and the Control Assy.
3.
Connect the nine connectors and one Earth connection. (See diagram below.)
4.
Fit the Joint Cover with 4off torx screws (M5x12).
5
Disassemble in reverse order.
Harness
Connectors
Connectors
Flange socket screws (M8 x 16)
Connectors
Earth connector
Connectors
Connectors
43