Finishing commissioning

16
Finishing commissioning
1. Select Commissioning > Activation on the display.
Ü
The Activation view is displayed.
2. Calibrate the output circuits for the sub-distribution units.
(Activation > Calibration > All)
3. Start the function test.
(Activation > Start function test)
4. Check the result of the function test in the test book.
(Activation > View test book)
5. Start the duration test.
(Activation > Duration test > Start)
6. Check the result of the duration test in the test book.
(Activation > View test book)
Note
i
·
If the batteries are not fully charged yet, a corresponding note is shown on the display.
·
If the duration test cannot be performed during commissioning, it can be delayed and started at a
later time. In this case the text Duration test missing is shown on the system status display until
a duration test has been carried out.
7. If errors must be resolved, lock the eBox system.
(Commissioning > Installation test > Lock system)
Ü
eBox system is locked.
8. Remove plug DC out from the recharging device.
Ü
The power to the output circuits is disconnected.
9. Resolve the error.
10. Insert plug DC out into the recharging device.
Ü
The voltage supply is reconnected.
11. Unlock the eBox system via the display.
(Unlock)
12. Tap Commissioning > Close.
Ü
The main view is displayed.
Ü
eBox system is in mains operation.
Ü
Circuit monitoring is enabled.
Ü
eBox system meets standards EN 50171 and EN 50172.
Ü
Emergency luminaires are switched on.
Finish commissioning