17
Next steps
Checking the eBox system function
1. Remove the connection between terminals PD and PD of the central phase monitor of the ONLITE central
eBox CPU.
Ü
eBox system switches to AC emergency operation.
2. Disconnect the voltage supply.
Ü
eBox system switches to battery operation.
3. Reconnect the voltage supply.
Setting the basic configuration
1. Set the switching modes.
(Configuration > Switching modes > SUBx > Kx > Assign switching mode)
2. Assign the bus phase monitors.
(Configuration > Emergency operation > SUBx > Assign phase monitors)
ONLITE central eBox, Quick commissioning 3.0 | 03.2019 | en
Next steps
EN
33