Preparatory Measures For Connecting Batteries - Zumtobel ONLITE central eBox Serie Puesta En Operación Rápida

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72

Preparatory measures for connecting batteries

7
Preparatory measures for connecting batteries
Before connecting the batteries, carry out the following preparatory measures in the main distribution unit:
1.
Lay out the 21 supplied stickers (symbol +, symbol -, numbers 1–18, one black/silver
sticker for recording the installation date).
2.
Lay out the supplied battery cables.
Cable type
Short black battery cable
Medium black battery cable
3.
Insert one medium-sized black battery cable underneath each battery compartment,
observing the correct poles.
i
4.
Insert the long battery cable for the ONLITE central eBox BCU recharging device in the
cable holders underneath the next-to-last battery compartment.
5.
Bend all cable holders by hand so that the cables can no longer sag.
Preparatory measures for connecting batteries
12
Length (mm)
170
870
Note
There are 5 cable holders underneath each battery compartment. The figure to
the left shows a side-view of the cable holders underneath the battery
compartments on a sample ONLITE central eBox MS1200.
ONLITE central eBox, Quick commissioning 3.0 | 03.2019 | en
Number for ONLITE central
eBox MS1200
14
3
Number for ONLITE central
eBox MS1700
12
5
Complete
Tabla de contenido
loading

Tabla de contenido