Connecting an external sub-distribution unit
Attention
Damage to devices when not wired correctly!
If DC and AC voltages are incorrectly connected, devices may be damaged beyond repair.
w
After connecting an external sub-distribution unit, ensure that the DC and AC voltage have been
correctly wired.
Connecting the ONLITE central eBox SCM
Note
i
A description of how to connect an ONLITE central eBox SCM in the main distribution unit can be
found in the device installation instructions and system installation instructions.
Connect ONLITE central eBox SCM
Connecting an ONLITE central eBox SUB external sub-distribution unit
8
1.
Open external sub-distribution unit ONLITE central eBox SUB.
2.
In the sub-distribution unit, remove the covers at the top and bottom.
3.
Route every cable connected to the external sub-distribution unit to the top
of the sub-distribution unit.
4.
Fix all cables connected to the external sub-distribution unit to the strain
relief rail.
5.
Connect the protective earth conductor to the earthing bar.
6.
Connect conductors L, N, B+ and B- to terminals L, N, B+ and B- on the
external sub-distribution unit corresponding to the slot number of the sub-
distribution unit connection (SUB 2 – SUB 5).
7.
Connect the system bus to terminals B1 and B2.
8.
Ensure that the DC and AC voltage have been correctly wired.
ONLITE central eBox, Quick commissioning 3.0 | 03.2019 | en