2.4.5.8.2.
Internal Grounding of PowerMount Cable, Harsh Enclosure
1. Place the ring terminal of the home run cable and the ring terminal of the included short black
2. Install the black, red, blue and white wires in the POWERCELL connector from the main board
30205319
|
11
|
07/2019
Ground and drain wires
with ring terminal
crimped on
Figure 2-75: Preparing PowerMount Cable Ground Wires
cable on the grounding stud inside the enclosure, and secure them in place using the nut and
washer.
Figure 2-76: Black Grounding Wire with Ring Terminal
Figure 2-77: Wires Connected to Internal Grounding Point
as shown and tighten them in place. Plug the connector into the IND570 main board.
Figure 2-78: PowerMount Cable Connection to Main Board
METTLER TOLEDO IND570 Terminal Installation Manual
Grounding stud
Nut with washer
2-39