2. Twist the black and green wires of the PDX cable together with the inner shield drain wire.
3. Carefully, wrap together the following:
4. Place the resulting bundle of cables in position for clamping, as shown in Figure 2-63.
5. Select the two larger clamping brackets, and two screws, to secure the cables.
Slot in rear panel
6. Secure the cable assembly by inserting one clamp into the left slot then rotating it down around
7. Insert a screw into the hole in the clamp and tighten to secure the cable.
8. Route the flat braided ground cable along the POWERCELL cable through the right cable clamp
2-34
METTLER TOLEDO IND570 Terminal Installation Manual
Table 2-7: Cable Preparation Lengths – Panel
A
Length of inner braid and outer shield drain wire from end of cable jacket
B
Length of black and green wires and internal drain wire
C
Length of red, blue and white wires
D
Length of insulation to strip from wires
Crimp the remaining ring terminal onto the end of this assembly.
Inner braided shield and foil (folded back over the outer shield)
Outer braided shield and drain wire
One end of the flat braided ground cable (from the Vehicle Scale lightning protection kit)
First clamp
External
ground stud
Figure 2-63: Securing the POWERCELL Cable – Panel
the cable.
and secure with the second clamp and screw in place as shown in Figure 2-63.
Description
Figure 2-62: Large Clamping Brackets
Length
20 mm (0.8 in)
55 mm (2.2 in)
130 mm (5.2 in)
5 mm (0.2 in)
Flat braided
cable
Second clamp
30205319
|