Connecting The Burner To The Boiler; Assembling The Gas Train - baltur TBG 45 ME Manual De Instrucciones Para El Uso

Quemadores de gas de dos etapas progresivas / modulantes con leva electrónica
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
CONNECTING THE BURNER TO THE
BOILER
ASSEMBLING THE HEAD UNIT
-
Position the insulating gasket 3 on the sleeve inserting cord 2
between flange and gasket.
-
Loosen screws "6", adjust the position of the coupling flange
"5" so that the combustion head penetrates the furnace up to
the length recommended by the generator manufacturer.
-
Fasten the burner 4 to the boiler 1 by means of the stud bolts,
washers and the nuts provided 7.
Completely seal the gap between the burner sleeve and
!
the hole in the refractory material inside the boiler door
with suitable material.

ASSEMBLING THE GAS TRAIN

There are different ways of assembling the valve train, 8, 8a and 9
as shown in the drawing. The burner is supplied with the gas train
connection facing downward. If you wish to invert the direction of train
entrance to allow the valve set to be assembled in configuration 9,
follow the procedure described in the section entitled: "Preparation
for connection with train turned upward". Choose the most rational
position for the set-up of the boiler room and the position in which
the gas pipe arrives.
7 / 22
0006081533_201403
Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 60 me

Tabla de contenido