CONNECTING THE BURNER
TO THE BOILER
aSSemBLIng tHe HeaD UnIt
A) Adjust the position of connector flange 5 by loosening the
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
generator manufacturer.
B) Position the seal insulation 3 on the tube unit inserting cord 2
between flange and seal.
C) Fasten the Combustion Head unit 4 to the boiler 1 by means
of the stud bolts, washers and the nuts provided 7.
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.

aSSemBLIng tHe gaS traIn

There are different ways of assembling the valve train 8 and 8a
as shown in the drawing. Select the best position according to
the particular arrangement of the boiler room and the gas piping's
entry position.
In case of very large valves, e.g. DN65 or DN80, make sure
there is an adequate support to prevent excessive stress on
the gas train connector.
aSSemBLIng tHe VentILatIng UnIt
A) Position the half-hinge on the burner crosshead nut in line with
those on the combustion head assembly.
B) Insert the hinge pin 10 in the position considered most suitable.
C) Connect the cables (ignition and ionisation) to the corresponding
electrodes, close the hinge, locking the burner by means of
screws 11
D) Insert the gas butterfly valve control lever on the shaft blocking
it with the appropriate nut.