EN
Fabrication Nº:
721021-70-1 / 721021-70-3
Client:
UNIPHARMA
Equipment:
VESSEL FOR CREAMS – Mod. VCR 1002 / MELT TANK – Mod. MET 0400
ES
OPERATING INSTRUCTIONS AND MAINTENANCE MANUAL
MDI VCR (v1.0)
Fig 6.7. Circulation with CIP shearing
Fig 6.8. Circulation without CIP shearing
Once you have selected the reactor's operating mode and before you
start it, the programme will display the image corresponding to the
selected operation and request you to check and confirm that the
position of the valves is correct.
Ref. ProJect / Revision:
721021-07 / R01
Date:
11-2015
46 of 153