INSTALLATION

8.1 SECURITY WARNINGS

Installation, start-up and maintenance may be performed by properly
trained and qualified staff.
During the installation, commissioning and maintenance it is necessary
to use the personal protective equipment.
It is essential to follow all safety rules when working, understand the
precautions listed in technical documentation, as well as any other
relevant security precaution.
Electrical connections should be done according to the electrical
regulations in force and should only be handled by qualified staff.

8.2 TRANSPORT

For equipment transport, the following warnings must be taken into account:
Do not turn the packaging box upside down.
The equipment must always be transported in horizontal position.
Material should be stored in a dry, fresh place away from light.

8.3 EQUIPMENT INSTALLATION

8.3.1

Previous verification

Before installing and connecting the equipment, the following verification must be
carried out:
Verify that the network's voltage matches the voltage indicated on the
equipment plate.
Verify that the service connections necessary to start-up the equipment
are available, and that they have appropriate characteristics.
Ref. ProJect / Revision:
721021-07 / R01
721021-70-1 / 721021-70-3
VESSEL FOR CREAMS – Mod. VCR 1002 / MELT TANK – Mod. MET 0400
Client:
UNIPHARMA
Date:
11-2015
EN
ES
MDI VCR (v1.0)
39 of 153

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Met 0400721021-70-1721021-70-3

Tabla de contenido