Connection To The Building Installation - Porsche Home Energy Manager 9Y0.915.686 Manual De Instalación

Ocultar thumbs Ver también para Home Energy Manager 9Y0.915.686:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
Installation and connection
Routing connecting cables
DE
Before installing any equipment, route the
EN
connecting cables inside the distribution cabinet in
accordance with local regulations, and protect all
FR
electrical interfaces from contact.
e Use suitable installation cables in accordance
IT
with local regulations.
ES
e Cut installation cables to suit the available space
and installation locations.
PT
e Ensure installation cables comply with the
NL
product-specific bending radii, to prevent faults
in cables and hardware.
SV
FI
Connection to the building
installation
DA
Connect all devices to the existing building
NO
installation in accordance with locally applicable
EL
regulations and standards. The following
abbreviations are used in these instructions:
CZ
– N = neutral wire
HU
– L = live wire
PL
Connecting an external mains
power supply unit
HR
e Follow the manufacturer's installation
SR
instructions.
f Refer to chapter "Applicable documents" on
SK
page 18.
SL
e Connect the DC output to the energy manager in
accordance with the pin assignment of the power
ET
supply connector (J102).
e Connect the power supply unit to the energy
LT
manager using a cable. This cable must be
LV
produced by an electrician.
RO
BG
MK
24
Connecting RS485/CAN communication
Information
The software 08/2019 does not allow for connection
to RS485/CAN. For future features, please pay
attention to information on new software releases.
When connecting the energy manager to the building
installation, there is a risk that DC power supply
connectors (J102) may be inadvertently plugged into
the RS485/CAN port. This can damage the energy
manager. Insert the six-pole connector without
connection cable (J1000) that was included with
delivery, to prevent confusion.
e Insert the connector without connection cable in
socket J1000 in the housing of the energy
manager.
Connecting relay channels
Information
The software 08/2019 does not allow for connection
to relay channels. For future features, please pay
attention to information on new software releases.
The energy manager is delivered with a suitable
connector without connection cable.
e Insert the connector without connection cable in
socket J900/J901 in the housing of the energy
manager.
Push-on connector for current measurement
Parameter
Value
Push-on connector
J200/J300/J301
Manufacturer
Phoenix Contact
Socket part number
1766369
Connector part number
1939439
Overview of J200/J300/J301 connectors
Fig. 10: Overview of J200/J300/J301
1 Pin 1
2 Pin 2
Tabla de contenido
loading

Tabla de contenido