Nogueira NEW PECUS Duo G2 Manual De Instrucciones página 172

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4. Preparation
If necessary, loosen the jam nut (G) and
adjust the tensioner length (H).
Tighten the tensioner by turning the
12.
spindle (H). Retighten the jam nut (G);
Attach the 4 hoses (of the hydraulic motor
13.
and the deflector) to the outlet chute's
fasteners (fig. beside);
Fit the hydraulic cylinder (M), securing it
14.
with pins (P) and (Q). Mount the 4 counter
pins (R).
R= Counter pin 3/16" x 1 1/2" (04 pcs)
44
L
Instructions Manual
K
L
G
R
P
M
Q
H

Capítulos

Tabla de contenido
loading

Tabla de contenido