Fagor PS-20/140 M Manual De Instrucciones página 18

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
The outlet duct must be as short as possible. It should not exceed 5 metres, have more than
2 90° bends and should have a 2% outward slope in horizontal sections to prevent
condensate from flowing back to the machine, and it must be fitted with a check valve.
If the evacuation duct must exceed 5 metres and 2 bends, it is advisable to
increase the evacuation duct diameter or to add an extraction motor in the duct.
The extraction motor sizing must be calculated by a company specialised in air handling using
the following indications:
-
Fan motor power:
-
Extraction rate:
-
Head loss at fan outlet:
2.2.7 Commissioning
After making sure that the machine is installed according to the recommendations in this
manual (levelling, electricity connection), start up the dryer ironer:
Turn the cut-off switch at the back of the machine on the left side to position 1.
Check that the emergency stop button has not been triggered
Press START to remove the wax paper wrapped around the cylinder.
Make sure that the feelers are in the correct positions before and just after the 1
of the machine as they could be mispositioned due to the paraffin wax applied in the
factory to protect the cylinder from corrosion (see section 4.4).
Check that the machine is working properly (in the event of any anomaly, refer to
section 5).
Train the operating personnel in the use of the machine as described in section 3.
0.09 KW
300 m
/h
3
30 Pa
st
start
12
loading

Este manual también es adecuado para:

Ps-20/160 mPs-20/200 m