Dometic WAECO CoolAir SP-900 Instrucciones De Instalación página 36

Equipo de aire acondicionado split para camiones
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
SP-900-Install.book Seite 36 Montag, 25. Januar 2010 4:53 16
Installation
5.3
Installation steps
Caution
The manufacturer only assumes liability for parts included in the scope
of delivery. The validity of the warranty expires if the system is installed
together with third-party parts.
5.3.1 Determining the installation position
The system's installation position must meet the following criteria:
The installation position must be chosen so that maintenance work can
be performed without difficulties and so that there is sufficient space for
the add-on parts (refrigerant line).
The condenser and evaporator unit may not be inclined horizontally or
vertically during installation (see Fig. 5 on page 5).
The condenser unit must not be fitted near direct waste heat
(engine heat etc.).
The length of the refrigerant line (approx. 1.7 m) must be sufficient for
the connection of the condenser and evaporator unit. The line must not
be laid taut (see Fig. 5 on page 5).
The fastening surface should be as flat as possible. Use spacer sleeves
for uneven surfaces. If spacer sleeves are used, longer fastening
screws with sufficient tensile strength (not included in the assembly set)
must be used.
Caution
Due to its weight, the condenser unit must have contact with at least two
fastening points of the fastening surface. Do not use spacer sleeves for all
six fastening points.
The freedom of movement of semi-trailers (the outer edges of the trailer
when turning) and other vehicle attachments must not be restricted.
36
a
a
CoolAir
loading