OEM DOMITOR DM-DB Manual De Uso Y Mantenimiento página 57

Horno para pizza
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

DOMITOR DM/DB
Installation and connections
Two-, three-chamber oven assembling (Fig 3)
(For 430-435 models, only)
To assemble the two-chamber oven, position the
second oven (7) the fi rst oven (6) and fi x it by the
small bracket (8) and the screws (9).
Concerning three-chamber ovens, the third oven shall
be put onto the second one and fi xed as above.
Hood assembling (Fig 5)
The hood (10) shall be positioned on the last oven
and fi xed by the four existing screws (11).
Chimney assembling (Fig 5)
Unpack the chimney (12) and place it on the back of
the oven (see fi gure) by the screws (13) and relevant
washers supplied with.
In case of two- or three-chamber ovens, start assem-
bling the chimney from the lowest oven, then insert
the other chimneys one on the other (see fi gure)
placing them on the relevant ovens.
By the screws supplied with place the cap (14) under
the chimney of the lowest oven.
FIG. 3
7
FIG. 4
10
FIG. 5
12
13
9
8
6
11
14
GB - 13
Tabla de contenido
loading

Tabla de contenido