Preparing for operation
Preparing for operation
CAUTION
Crushing of the fingers due to the
carriage tilting as a result of soiled
guide rails.
Make sure that the guide rails are
clean.
Clean soiled guide rails before
commissioning.
CAUTION
Cuts due to missing edge guards on
the longitudinal carriage.
Make sure that the edge guards are
present and firmly mounted on the
longitudinal carriage.
Immediately replace missing edge
guards.
For the position of the edge guards, refer to the
illustration on page 10.
Preparing the calibration and
adjustment facility
The following points must be guaranteed:
Switch the main switch off.
Make sure that the electrical connection to the
mains power supply is correct.
Make sure that the bridge connector is inserted or
the manual operating terminal is connected.
Make sure that all components, particularly the
protective facilities, are functional by checking the
components for proper operation and damage.
Make sure that all attaching parts are firmly
seated and the calibration and adjustment facility
is anchored.
Make sure that the emergency stop button is
released.
32
Preparing the PC
ATTENTION
Malfunctions due to non-installed
software.
Only connect the USB adapter to the
PC once the TORKMASTER has
been installed.
Connect the USB adapter's jack plug cable to the
corresponding socket (1).
Make sure that the TORKMASTER software is
installed on the PC.
Connect the USB adapter to the PC.
Start the TORKMASTER programme on the PC.