Stahlwille perfectControl 7794-2 Traduccion Del Manual De Instrucciones Originale página 71

Dispositivo de ajuste y calibración con motor
Ocultar thumbs Ver también para perfectControl 7794-2:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 150
Connecting
Location on the calibration and adjustment facility
Establishing connections
To connect the calibration and adjustment facility,
use the mains power cable with the appropriate
connector for the connection used at the operating
location. Seven mains power cables with the usual
world-wide connections are contained in the scope
of delivery.
Insert the mains power cable's IEC power
connector into the IEC power connector socket
(2).
Insert the bridge connector into the corresponding
connection (1).
Alternatively, the manual operating terminal can be
connected here.
Connect the calibration and adjustment facility to
the mains power supply using the mains power
cable's grounding-contact type connector.
22
Connection
Reference connection (transducer)
(Laterally on the protective cover bracket):
Connect the transducer here (1). Use only the
intended STAHLWILLE connecting cable for
transducers (helical cable) for this purpose.
This cable must not transfer any forces to the
transducer. Lateral forces can negatively influence
the calibration results.
loading

Este manual también es adecuado para:

91979873