6 Putting into operation
6.3 Connecting the coolant
WARNING
Risk of burns
The cable assembly overheats if the coolant level is too low.
• Wear the correct protective gloves.
• Check the coolant level at regular intervals.
NOTICE
• Check the minimum fill level on the cooling unit.
• Ensure that the coolant supply and return hoses have been correctly installed. Coolant
supply = blue, coolant return = red.
• Do not use deionized or demineralized water as coolant or for leak and flow tests.
This may shorten your welding torch's service life.
• For liquid-cooled welding torches, we recommend using ABICOR BINZEL BTC coolant.
Please consult the applicable safety data sheet.
• The cooling system must be purged of any air each time the device is commissioned and
after every cable assembly replacement: Disconnect the coolant return hose from the
coolant recirculator and hold it over a collection receptacle. Seal the opening on the
coolant return hose then abruptly release to re-open it. Repeat until the coolant flows into
the collection receptacle continuously and without air bubbles.
6.1.1 Euro CC on page EN-12
6.1.2 RPC on page EN-12
1 Connect the coolant supply hose (5) and the coolant return hose (6) to the coolant
recirculator.
EN - 14
ROBO Compact W500 / W600