4 Putting into operation
4.2.1 Liner
NOTICE
• New and unused liners must be abridged to the actual length of the cable assembly.
• To install the wire guide with a little preload, excess length of 14 mm is required.
4.2.2 PA liner
NOTICE
• New, as yet unused PA liners have to be abridged to the actual length of the cable
assembly.
• For PA liners with an outer diameter of 4.00 mm, the capillary tube in the distance
adaptor must be replaced with a guide tube.
• We recommend that you sharpen the PA liner to an angle of 40° before assembly using
the ABICOR BINZEL sharpener.
4.3 Attaching the cable assembly on the machine side
1 Join the central connector and the central socket at the wire feeder.
2 Use the connection nut to secure both.
3 Attach the coolant supply and return connectors
4 Attach the shielding gas and control lead connectors in the case of other machine
connections.
4.4 Connecting the coolant
WARNING
Risk of burns
The cable assembly overheats if the coolant level is too low.
• Wear the correct protective gloves.
• Check the coolant level at regular intervals.
EN - 8
MAG Welding torches
BAL.0147 • 2018-11-09