baltur BTL 20 Manual De Instrucciones página 17

Idiomas disponibles

Idiomas disponibles

- Before using the burner for the first time please carefully read the chapter "WARNINGS NOTES FOR THE USER : HOW TO USE
THE BURNER SAFELY" in this instruction manual, which is an integral and essential part of the product. The works on the burner
and on the esystem have to be carried out only by competent people.
- Read carefully the instructions before starting the burner and service it.
- The system electric feeding must be disconnected before starting working on it.
- If the works are not carried out correctly it is possible to cause dangerous accidents.
We declare that our products
BPM...; BGN...; BT...; BTG...; BTL...; TBML...; Comist...;
GI...; GI...Mist; Minicomist...; PYR...; RiNOx...; Spark...;
Sparkgas...; TBG...;TBL...; TBML ...; TS...; IBR...; IB...
(Variant: ... LX, for low NOx emissions)
Description:
forced air burners of liquid, gaseous and mixed fuels for residential and
industrial use meet the minimum requirements of the European Directives:
90/396/CEE ...............................................(D.A.G.)
89/336/CEE - 2004/108/CE ........................(C.E.M.)
73/23/CEE – 2006/95/CE ...........................(D.B.T.)
2006/42/CEE .............................................(D.M.)
and conform to European Standards:
UNI EN 676:2008 (gas and combination, gas side)
UNI EN 267:2002 (diesel and combination, diesel side)
These products are therefore marked:
0085
04/01/2010
ENGLISH
-
Warning notes ..................................................................................................................................................................... "
- Technical specifications ...................................................................................................................................................... "
-
Hydraulic connections ......................................................................................................................................................... "
-
Fitting to the boiler - Preparations for start up - Starting up and regulation ........................................................................ "
- Appliance specifications ...................................................................................................................................................... "
-
Electrodes adjustment - Air regulation - combustion adjustment ...................................................................................... "
-
Maintenance ....................................................................................................................................................................... "
-
Operation problems ............................................................................................................................................................ "
-
Pump particuler ................................................................................................................................................................... "
-
Electrical connections – Wiring diagram ........................................................................................................................... "
BALTUR S.p.A.
Via Ferrarese 10 - 44042 CENTO (Ferrara) ITALIA
Tel. 051.684.37.11 Fax 051.685.75.27/28
(International Tel. ++39.051.684.37.11 - Fax ++39.051.683.06.86)
http://www.baltur.it - http://www.baltur.com - E-MAIL [email protected]
Declaration of Conformity
1 / 14
0006080871_201104
Dr. Riccardo Fava
Managing Director / CEO
E
N
G
L
I
S
H
PAGE
2
4
6
7
8
10
12
13
14
59
loading

Este manual también es adecuado para:

Btl 14Btl 26