10-24. Test Run Procedure
GB
FR
DE
Turn ON the indoor
IT
and outdoor power.
(Automatic Address)
PT
GR
ES
DC̲Inverter̲Eng.indd 96
DC̲Inverter̲Eng.indd 96
Recheck the items to check before the test run.
Check the combination (wiring) of indoor and
outdoor units.
Is system "single-type"?
YES
(1 indoor unit is connected
to 1 outdoor unit)
Are multiple outdoor units used?
(See 10-26-2) How to Set the Outdoor Unit System Address
Set the outdoor unit system address.
(See 10-26-1, 2) How to Set Automatic Address
Set the automatic address setting
from outside unit.
Indicate (mark) the combination number.
Set the indoor unit control unit to "TEST".
Can
operation be
started?
Turn the power back ON to the indoor unit.
(See 10-11)
(See 10-26-1)
NO
NO
YES
(See 10-26-3, 4)
(See 10-26-3)
Refer to "Table of Self-Diagnostic
NO
Functions" to check the system.
In addition, refer to Item 10-26 and
correct any items that need to be
corrected.
YES
Note: Check the indoor-side drainage.
(See 10-13)
Fig. 10-24
96
Turn ON the indoor
and outdoor power.
(Automatic Address)
(See 10-25)
2007/07/25 13:21:53
2007/07/25 13:21:53