1.2

Installation Guidelines

1.2.1
Step 1: Unpack Analyzer and Accessories
1.
Immediately upon receipt, place the box of reagent rotors in a refrigerator (2–8 ºC or 36–46
ºF).
2.
Remove the analyzer from its box and place it on a stable, level surface.
3.
Complete and mail the warranty card within 10 days of installing the system.
Note:
This Operator's Manual is the most complete reference for the analyzer. Always refer to
this manual. Keep this manual in a convenient location for easy access, and store all
product and manual updates in it.
1.2.2
Step 2: Set Up Electrical
Connections
1.
Attach the AC power cord (with electrical
wall plug) to the analyzer's power adapter
(see the figure).
2.
Attach the DC power cord to the back of the
analyzer.
3.
Plug the AC power cord into a grounded
electrical outlet.
4.
Make sure all connections are secure.
Note:
To prevent power surges or drain, do not plug the analyzer into the same circuit as a cen-
trifuge or any other high-current device. If this is not possible, use an ancillary surge
protector or battery backup for the analyzer.