HOLZMANN MASCHINEN HBS 245HQ Manual De Instrucciones página 38

Ocultar thumbs Ver también para HBS 245HQ:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
15
MAINTENANCE
Don't clean or do maintenance on the machine while it is still connected to the
power supply:
Damages to machine and injuries might occur due to unintended switching on
of the machine!
Therefore: Switch the machine off and disconnect it from the power supply
be-fore any maintenance works or cleaning is carried out
The machine does not require extensive maintenance. If malfunctions and defects occur, let it be
serviced by trained persons only.
Before first operation as well as later on every 100 operation hours you should lubricate all con-
necting parts (if required, remove beforehand with a brush all swarfs and dust).
Check regularly the condition of the security stickers. Replace them if required.
Check regularly the condition of the saw band and the saw band guide.
The good condition and perfect adjustment of the guiding rollers is essential for a smooth band
guidance and a clean cut.
Store the machine in a closed, dry location.
Clean your machine regularly after every usage – it prolongs the machines lifespan and is a
pre-requisite for a safe working environment.
Repair jobs shall be performed by respectively trained professionals only!
15.1
Maintenance plan
15.1.1 After each workshift:
Relaxing the saw band.
Disconnect the machine from the power supply.
Clean the machine entirely.
Lubricate the blade guide with light machine oil a bit.
15.2
Cleaning
After each workshift the machine has to be cleaned. Remove chips etc. with a suitable tool. Do
not remove them by hand (cutting injury!). Remove dust as well.
The usage of certain solutions containing ingredients damaging metal
surfaces as well as the use of scrubbing agents will damage the machine
surface!
Clean the machine surface with a wet cloth soaked in a mild solution
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
A T T E N T I O N
N O T I C E
N O T I C E
MAINTENANCE
38
HBS 245HQ
loading