Electrical Connection - Cardin Elettronica ELSNAP RAPID S Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
It is very important that the barrier be well fixed to the fastening base as
the ground anchors could loosen throughout time due to movement and
vibration and cause damage to the cabinet and the boom.
(fig. 3/3a)
FITTING THE UNIT
Prepare a cement base with the base plate and anchors "C" (optional) embedded.
The cable passage pipe "D" and the four threaded bolts M12 must protrude (30 mm)
from the base plate.
The base plate must be perfectly in square, its surface must be clean and the
four threaded M12 bolts must emerge perpendicularly.
Note: the cement base should preferably protrude 50 mm out of the ground in
order to avoid water build up which could damage the appliance.
The size of the base plinth will vary according to the characteristics of the
ground.
Remove the 4 self-locking nuts "F" from the four threaded bolts (used to fasten
down the anchors) and insert the base of the barrier "E".
Fasten down the barrier using the 4 self-locking nuts "F" and washers supplied
with the appliance.
It is also possible to fasten the barrier to an already existing cement base as
long as the thickness of the base is great enough to guarantee a strong hold
for the rawlplugs.
We advise you to use the following type of rawlplug: "Steel anchor bolts M12/
Ø20 for heavy duty use".
FITTING THE BOOM (fig. 4-5)
Mount the boom fixing base "A" and fasten down using the supplied screws
"H" with a torque level superior to 70 Nm. Fit the boom support hub "B" and
fasten down using the screws "F". Insert the assembled unit "G" into the boom
support hub "B". Fasten the complete boom to the base A" and tighten down
the screws "F". Insert the end caps "C" and "I". Fit the semilunar hub covers
"E and D" and press down to fasten them into place.
SPRING INSTALLATION (fig. 6)
For the EL SNAPS and EL SNAPL versions first install the spring purchased
with the barrier, apply some grease to the threaded bar "B", locking nut "C" and
swivel head. Screw the bar clockwise into the upper part of the spring (indicated
by the colour).
Grease the tie rod of the hook "D" and screw it a few turns counter-clockwise in
the lower uncoloured part of the spring "A".
Hook the resulting spring-assembly "A" with the hook to the lower part of the
cabinet "F", fix the head to the spring mechanism "G" using the nut and bolt "E".
First use the outermost hole, and if the spring is too strong to balance the boom,
gradually use the holes further in. Screw in the threaded bar "B" to balance the
boom-spring system and lock the rod in place with the nut "C". Tighten the bolt
"E" with a torque of at least 85-90 Nm.
INVERTING THE BOOM OPENING DIRECTION SNAP RAPID (fig.
6a-6e)
To invert the boom opening direction from left (fig. 6a) to right (fig. 6e), release
the boom and move it to a vertical position "A" fig. 6b. With the spring "C"
at rest (NOT UNDER TENSION) unscrew and remove the nut and bolt "B".
Remove the spring. Dismantle and reassemble the boom to the right as shown
in figure 5 and move it to a vertical position "A" (fig 6c). Replace the spring "C"
and insert and fasten down the nut and bolt "B" (fig. 6d). Lock the boom and
select right-hand boom by moving dip Nr. 7 to ON (fig. 12), then carry out the
ECU initial programming procedure (pag. 18).
ASSEMBLING THE FIXED SUPPORT POLE (fig. 7-7a)
The fixed support pole is positioned at the head of the boom and functions as a
reference point for the closing of the barrier.
When the boom is moving it should never crash into the support pole but should
rest lightly against it instead.
Prepare a cement base in which the anchor plate "S" is to be inserted (make sure
that the M8 threaded bolts are protruding by 30 mm).
The base must be perfectly level, the threaded M8 bolts must emerge perpen-
dicularly and be perfectly clean.
Unscrew the four self-tapping screws on the four threaded bolts (needed to block
the anchors fig. 7a) and insert the base.
Fasten down using the supplied nuts and washers.
It is also possible to fix the base of the support to cement base or pavement
which already exists as long as it is wide enough and strong enough to take the
anchor bolts.
We advise you to use the following type of rawlplug: "Steel anchor bolts M8/
Ø14 for heavy duty use".
MANUAL MANOEUVRE (fig. 8)
Caution! The manual manoeuvre should only be carried out if the equipment
has locked due to power failure or during installation of the automation.
Access to the release mechanism may be on the right or left according to
the installation.
To access the mechanism, first turn the key as indicated in the sequence A
(leave the key inserted) then release the motor using the hex wrench provided
(sequence B and C). To relock the motor, carry out the reverse procedure.
ACCESS TO THE CABINET (fig. 9)
To access the mechanical / electronic controls using the key provided: turn
the key "1" counter clockwise and remove the top cover "2". Pull the panel "3"
upwards to remove it.
MECHANICAL ADJUSTMENT OF THE HORIZONTAL POSITION
OF THE BOOM (fig. 10-10a)
The rubber travel limits are factory set for the 0° and 90°opening positions, no
further adjustment is necessary unless you require other opening angles. See
paragraph "Programming the opening and closing positions".
Release the boom and raise it until the barrier is in the open position"1". Loosen
the nut "2" by turning it counter clockwise, put the spirit level "3" on the boom
and turn screw "4" to adjust the vertical position. With the boom in the correct
position "5", tighten the nut "6".
BALANCING THE BOOM (fig. 10b)
Release the boom, open the cabinet panel and turn the nut "1" counter clockwise
(approx. 5 turns). Turn the spring counter clockwise to increase the tension or
clockwise to decrease the tension until the boom remains in position "3", i.e.
inclined by about 30° - 40°. Having balanced the boom, tighten the nut "4".

ELECTRICAL CONNECTION

All rights reserved. Unauthorised copying or use of the information contained in this d
Important remarks
• The presence of the electrical current sensor does not dispense with the
obligation to install photoelectric cells and other safety devices foreseen
by the safety standards in force.
• Before connecting the appliance make sure that the voltage and frequency
rated on the data plate conform to those of the mains supply.
• The power cable must be made of polychloroprene in conformity with the
international standard 60245 IEC 57 (eg. 3 x 1.5 mm
• The cable may only be replaced by qualified technicians.
• An all pole trip switch with at least 3 mm between the contacts must be
installed between the unit and the mains supply.
• Don't use cables with aluminium conductors; don't solder the ends of cables
which are to be inserted into the binding posts; use cables marked T min
85°C and resistant to atmospheric agents.
• The terminal wires must be positioned in such a way that both the wire and
the insulating sheath are tightly fastened.
• Connect the control and security device wires.
• Run the mains power supply through the cable clamp located on the bottom right
of the main circuit board and to the separate 3-way terminal board:
- connect the neutral to binding post N
- connect the earth to binding post
- connect the live to binding post L
Drawing number :
DI0286
15
Product Code :
H05RN-F).
2
N
L
Description :
Fissaggio placca inferiore
Collegamento motore
Tabla de contenido
loading

Este manual también es adecuado para:

Elsnap rapid l

Tabla de contenido