Mitsubishi Electric CITY MULTI PQHY-P-YLM-A Serie Manual De Instalación página 13

Tabla de contenido
10
[Fig. 10.5]
A
E
D
I
B
H
I
[Fig. 10.6]
H
B
C
D
E
G
F
A
F
G
L
I
J
K
10.5
C
J
L
K
10.6
K
J
I
M
A : Position the edge of the supplied paper with mark at the
edge of the pipe cover.
Then, wind the sealing material to the pipe, using the
mark on the paper to properly align it.
B : Extend the field-supplied insulation all the way to the end
of the sealing material described in step A.
C : Install the water stopper at the end face of the insulation.
D : Mark
E : Install the sealing material so that the edges of the mate-
rial meet at the top.
F : Inside the unit
G : Pipe cover
H : The seam of the insulation should be at the top.
I : Sealing material for water stopper
J : Install the water stopper so that the slit of the water stop-
per is at the top.
K : Water stopper
L : Sealing material for field piping
A : Enlarged view
B : Sealing material attachment process
C : Process 1: Attach the sealing material (for base leg) 1.
D : Process 2: Attach the sealing material (for base leg) 2.
E : Process 3: Attach the sealing material (for water panel).
(only right front)
F : Panel assy W
G : Only sealing materials (for base leg) 1, 2
H : Sealing materials (for base leg) 1, 2 and sealing material
(for water panel)
I : Sealing material (for base leg) 1
J : Sealing material (for base leg) 2
K : Sealing material (for water panel) (only right front)
L : Put sealing material inward.
M : Match the end face.
13
Tabla de contenido
loading

Tabla de contenido