Two-Cycle Trigger Function; Putting Out Of Operation; Maintenance And Cleaning - Abicor Binzel B Serie Instructivo De Servicio

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6 Operation

5.1 Two-cycle trigger function

6 Operation

7 Putting out of operation

8 Maintenance and cleaning

EN - 8
1 Press and hold the trigger on the handle = start welding.
2 Release the trigger = stop welding.
1 Open the shielding gas cylinder.
2 Switch on the power source.
3 Set the welding parameters.
4 Start welding.
NOTICE
• As liquid-cooled cable assemblies start to leak when they overheat, the
cooling unit should continue running for approx. 5 min. after welding.
1 Stop welding.
2 Wait until the shielding gas post-flow time has passed and then switch off
the power source.
3 Close the valve on the shielding gas cylinder.
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance,
servicing, assembly, disassembly and repair work:
• Switch off the power source.
• Close the gas supply.
• Close the compressed air supply.
• Disconnect the mains plug.
Welding torch B
Tabla de contenido
loading

Tabla de contenido