4. INSTALLATION
1.2 - PUMP ASSEMBLY
- Then lift the pump body (P) by means of 2 eyebolts (H). (Fig.23)
- Place it on the intake pipe flange being careful to correctly insert the
relative rubber gasket (G).
- Fasten the two flanges at the specified torque (see table 1)
- Lift the entire unit and remote the lower bracket (S1) located on the
intake pipe.
- Lower everything until the upper bracket (S2) is resting.
- Remove the eyebolts (H).
- Grease the threaded ends of the pump shaft with anti-seize grease
- Tighten the sleeve (M) and remove the excess grease.
- Insert the gasket (OR) into the delivery body.
ASSEMBLY OF HEAVY
UNITS
18
TIGHTENING TORQUES