Urrea SM1010 Manual De Usuario Y Garantía página 40

Sierra de mesa contractor
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

If an adjustment is necessary, proceed as fol-
lows: Loosen and remove the six socket pan
head screws and the rear panel. Loosen the
four hex head bolts on the trunnion and shift
trunnions until a position is found where the
saw blade is parallel to the miter guage slots.
NOTE: Saw blade should also be centered
within its table insert opening.
Equal
Distances
Miter Gauge Slots
Remove six screws
Remove Rear panel
Adjust Trunnions to align blade and miter slot
40
• Tighten the hex head bolts and lock washers
very securely.
This procedure will set the table and blade
in parallel position and prevent the trunnion
from shifting.
NOTE: If you perform this adjustment, leave
the back panel off to perform rear rail assem-
bly as described in the next section.
RAIL ASSEMBLY
Rear
Tools Required: 13mm Open end Wrench
Hardware Required: Eight M8 x 28 hex head
bolts, eight M8 x 25 hex head bolts, four M8
Saw
x 20 hex head bolts, twenty M8 lock washers,
Blade
twenty M8 flat washers, sixteen M8 hex nuts
and four M8 acorn nuts. (Hardware bag #2).
• Insert two M8 x 28 hex head bolts and two
M8 x 25 hex head bolts into the T-slot of the
right front guide rail. (The two longer bolts
will attach to the table; the two shorter bolts
attach to the table extension.)
• Attach right front rail to the table and right
table extension using flat washers, lock wash-
ers and hex nuts.
NOTE: Hand tighten all hardware during rail
assembly. Do not completely tighten hardware
Front
until all rails are mounted.
• Attach left front rail in the same manner.
(The two longer bolts attach to the table; the
two shorter bolts attach to table extension.)
NOTE: You may have to shift right rail as far
right as it will go to attach left rail.
• Position rails so that rails are butted togeth-
er and the joint between rails is aligned with
right side of the blade. You may need a mallet
to lightly tap rails together. Make sure rails are
completely butted together at the joint.
• Use a straight edge as shown to check level
and flatness between right and left rail. Use a
combination square as shown to make certain
that both front rails are parallel to the table
surface.
• After front rails are adjusted level and flat,
tighten the screws completely.
• Secure all hardware completely.
M8 x 25 Bolts
M8 x 28 Bolts
Tabla de contenido
loading

Tabla de contenido