Arneg Alba Guía De Instalación Y Manejo página 43

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 103
Alba-Bucarest
English
WARNING!
Before carrying out any operation, take all possible precautions to prevent injuries to the
operator, use the Personal Protection Equipment provided (chapter 3).
ATTENTION! Discarded packing parts. Injury.
Do not leave packing parts (nails, wood, staples, etc.) and tools used for the operation (pli-
ers, scissors, etc.) in the working area.
These objects must be removed with appropriate means and taken to their respective col-
lection places.
Installation is reserved to technicians trained and authorised by the body specified in the
contract (manufacturer/dealer/distributor)
i
- It is the responsibility of the customer to prepare the installation area
- Changes to the set-up described here must be authorized by ARNEG S.p.A.
The counter can be delivered packed as follows:
• standard: wooden frame secured to the base and nylon cover held by straps (Fig.6)
• optional:
cardboard box (Fig.7); wooden crate (Fig.8)
The installation
• comply with the local standards in force
• comply with the environmental climatic class chap.8
area should
• have a floor able to support the weight of the counter
• be equipped with a switch with automatic protection against short circuits, earth dis-
• provide the space required for correct ventilation, use and maintenance
Conditions
For the cabinet to work properly, the room temperature and relative humidity
must not exceed the limits of a climate class 3 (+25°C; R.H. 60%) according to
environmental
the standard EN ISO 23953 - IEC/EN 60335-2-89.
counter delivery • ensure the packing is intact and that it does not display readily apparent damage
• carefully perform the unpacking operation in order not to damage the counter
• check that counter components are intact
• should you notice any damage immediately inform the manufacturer
Installation
procedure
(Fig.5)
40
charge and leakage circuit between the electric power line and the cabinet
ATTENTION! Accidental opening of the doors. Injury.
Keep the doors closed and locked during installation.
ATTENTION! Accidental opening of the doors. Tilting of the cabinet. Injury.
Carefully examine the installation area, eliminating any danger to the operator
remove the package only if the counter is placed in the area of use.
Step
1
carefully examine the installation area, eliminating any danger to the operator
2
remove the package only if the counter is placed in the operation area
3
lift the counter safely
4
use suitable scissors to cut the clip tightening straps-A-
5
remove the clips and the frame
6
lower and place the counter in the area of use
7
adjust the horizontal position of the cabinet using a spirit level (Fig.9)
8
check that all feet are into contact with the floor
9
level the counter both in front and back
10
fit the cabinet with an inclination towards the wall of at least 10mm (Fig.11)
11
gently remove the protective film, eliminate glue residues with suitable solvents
12
carry out the first cleaning using neutral products and a soft cloth.
Install maximum 3 counters within the same power supply and cooling line
Should you need to move the counter, the latter must be levelled again.
Incorrect levelling
Action
05060188 00 10-02-2020
Tabla de contenido
loading

Este manual también es adecuado para:

Bucarest

Tabla de contenido