Mettler Toledo IND560 PDX Guia De Instalacion página 70

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

4. Place the small metal sealing plate from the sealing kit over the plastic
standoff beside the metrology security switch as shown in Figure 2-69.
Figure 2-69: Metal Sealing Plate
5. Screw the long sealing screw through the hole in the small metal plate through
the main board and into the plastic locking plate beneath the board.
6. Thread the wire cable through the hole in the sealing screw and the plastic
post as shown in Figure 2-70.
7. Remove any slack in the wire and snap the seal shut.
8. Reinstall the main board in the panel-mount enclosure.
PDX Load Cell Sealing
Remove the backing paper from the paper seal included in the sealing kit and
place it over the load cell terminal strip connector so that it covers the heads of the
terminal screws and also secures the connector to the plastic plate of the IND560
PDX, as shown in Figure 2-71.
Figure 2-71: Load Cell Paper Seal
IND560 PDX Installation Manual
Figure 2-70: Sealing Wire
2-41
Tabla de contenido
loading

Tabla de contenido